Friday, January 16, 2015
ATTENTION NIGERIANS: PRESIDENT GOODLUCK JONATHAN is working......... remember
ATTENTION NIGERIANS: PRESIDENT GOODLUCK JONATHAN
is working.........
remember
1. 125 Almajiri Schools in 13 Northern States (No northern
govt. ever deemed it fit to educate the so called rejects of
their society till GEJ came on the scene, even Buhari)
2. 27 Special girls school 3.
12 New Federal Universities
4. 34 new NCE awarding institutions
5. 101 Presidential Special Scholarship for Innovation and
development
6. 10 Million increase in Basic education enrollment (UBEC)
7. 75% Increase in O'Level credit pass in Math and English
8. 100 Innovation Enterprise Institutions licensed
9. 7000 lecturers sponsored for post graduate studies home
and abroad
10. 51 Polytechnic laboratories rehabilitated
11. Doubled increase on Education allocation
12. 104 candidates scaled the final hurdle (First Class
Graduates) for Presidential scholarship award and were asked
to apply to study in any of the top 25 universities in the world
approved for the scheme for their Phd.
LIST OF GEJ Universities:
1] Federal University, Lafia, Nasarawa State. —North Central.
2] Federal University, Lokoja, Kogi State. ——-North Central.
3] Federal University, Kashere, Gombe State.– North East.
4] Federal University, Wakari, Taraba State. —-North East.
5] Federal University, Dutsin-Ma, Katsina State.-North West.
6] Federal University, Dutse, Jigawa State.——-North West.
7] Federal University, Otuoke, Bayelsa State. —South South.
8] Federal University, Ndufe-Alike, Ebonyi State.-South East.
9] Federal University, Oye-Ekiti, Ekiti State.——-South West.
10) Federal University of Oil and Gas, Bonny, Rivers State -
South South
ROADS: The following roads are either
reconstructed of nearing completion:
1. Apapa - Oshodi Expressway
2. Benin-Ore-Sgagamu Highway
3.Enugu-Portharcourt Dual carriage way
4. East-West Road The following roads are undergoing
dualisation:
1. Kano - Maiduguri Road
2. Abuja-Abaji-Lokoja-B enin Road The following is fully done:
Oweto Bridge across River Benue The Following Roads are
fully done: 1. Onitsha-Owerri Road
2. Vom-Manchok Road
3. Onitsha Head Bridge-Flyover (Ojukwu Gateway) to Upper
Iweka road which Gov Obi repaired and got federal refund The
following roads are under construction or reconstruction:
1. Onitsha - Enugu Road
2. Lokoja - Benin Road
3. Lagos-Ibadan Expressway
4. Mokwa-Bida Road
5. Akure-Ilesha Road
6. East-West Road
7. Sokoto-Tambuwal-Jega Road
8. Enugu- Abakaliki- Cross River Road
9. Ogoja - Ikom Road
10. Vandekiya-Obudu Road He might not have started some
of them but he is ensuring that work is going on (eg East-
West Road) BRIDGE The second Niger bridge which previous
governments played endless politics with was concessioned
to Juluis Berger and early works have commenced.
ELECTIONS No governorship election
conducted under Jonathan administration has been cancelled
or deemed fraudulent by any court of law. Elections may not
be yet perfect but at least results mostly reflect the wishes of
the people. No political prisoner anywhere in Nigeria under
GEJ admninistration.
AVIATION:
1. National Aviation Master plan and Road map was
developed and is being implemented
2. Air Safety - INSTALLATION of cutting age navigational aids
and Instruments Landing Systems, including runway lights
and Total Radar Coverage (TRACON)
3. Airport Infrastructure - For the first time in three decades,
ALL 22 federally owned airports are being remodeled and
renovated
4. Cargo Airport - 16 airports close to nation's food baskets
designed to transport perishables.
5. New Terminal for 5 International Airports at Lagos, Abuja,
Port Harcourt, Kano and Enugu. 6. Certification - US Category
1 Certification attained.
INDUSTRIES: 1. Under GEJ, Nigeria has two automobile
industries manufacturing vehicles, Innoson in Nnewi, Hyundai,
Kia and Nissan in Lagos. Toyota to start assembling cars in
early 2015.
2. Nigeria exports cement and rice.Prices of food have
remained relatively stable for 2 years now.
HOUSING:
1. Mortgage - The Nigerian Mortgage
Refinancing Corporation was set up to enable 200,000
affordable mortgages within 5 years at affordable interest
rate. Over 324 such housing units were recently
commissioned in Enugu this July.
2. Over 61,000 housing units have been built in six
geographical zones. LIFE Life expetancy under GEJ improved
from 47 years in 2010 to 52 years in 2014 (UN)
CORRUPTION According to the report released on December
3, 2014, Nigeria scored 27 out of out of a maximum 100
marks to clinch 136th position out of the 175 countries
surveyed. This means that Nigeria has ‘improved’ by eight
points against its 2013 rating as 144th out of 175 countries.
A statement issued from the Berlin office of Transparency
International shows that more than two-thirds or over 75
percent of the 175 countries surveyed this year scored below
50, on a scale from 0. Countries within the 0-50 range are
perceived to be strikingly corrupt.
RAIL
TRANSPORT: Over 15 years, Rail transport
had been comatose and deserted. It took GEJ less than 2
years to put it back on track and commissioned 6 New Air-
condition Trains in Lagos last.
1. Lagos-Kano Rail (functional)
2. Kano-Maiduguri,under construction
3. Lagos-Portharcourt (under construction)
4. Kaduna-Abuja - Almost completed, to begin operation in
first quarter of 2015
5. Lagos-Oshogbo line fully operational.
6. Port Harcourt-Aba-Umuahia -Enugu fully operational from
December 2015. Intra PH rail system fully operational.
7.Rigachikun-Kaduna- Taunin Kura rail line fully operational.
Under construction: 1. Abuja axis - to begin operation in Dec.
2014 3. Port-Aba-Uyo-Calabar under construction. Kano/ Dai/
Jimbia an approximate distance of 354KM, Ilela/ Sokoto/
Jega / Kontagora, 408km, Aba/ Ikot Ekpene/ Itu/ Uyo /
Odukpani/Calabar, covering a total distance of 340km, Kano/
Nguru/ Geshua/ Damaturu/ Maiduguri/ Gamburu Ngala,
covering 707 Km, Calabar/ Ikom/ Obudu/ Ogoja/ Katsina Ala/
Wukari/ Jalingo/Yola/ Maiduguri, 1669km. The last of the
corridor is the rail line from Port Harcourt/ Aba/ Umuahia/
Enugu/ Lafia/ Jos/ Bauchi/ Biu/ Maidiguri, 550km
POWER: Privatised PHCN and Power Generating
Plants undergoing constructions in different states. 37 large
dams completed nationwide, 10 dams rehabilitaed and 49
dams being built nationwide.
Economy: Nigerian economy was rebased and became
biggest economy in Africa, overtaking South Africa.
Previous leaders didn't see the need to do this. Single digit
inflation and sustained growth in economy. Nigeria's
economy is the 26th largest in the world.
In 2013, IMF classified Nigeria as a Middle Income Nation
from the Low Income Nation it had been all the while. IMF
also said that hunger has reduced in Nigeria under Jonathan
from 16% to 14.1%. KPMG also listed Nigeria's interstate
High Speed Rail project as one of the world’s top 100
infrastructure projects.
The rail system which is currently under construction would
connect all states of Nigeria to one another.
Economic growth has been at a constant minimum of 6%per
annum in the lsat 3 years Agriculture has grown considerably,
Nigeria imports less food and produces more than enough for
export.
The airports now wear new looks unlike before when they
looked like Oshodi bus stop of the OBJ era. Elections are now
free and fair and no snatching of ballot boxes.
Some horribly sentimental people would not do the needful
which is to try to verify these things, they would still continue
on their hateful trajectory.
In all of these things that the GOD chosen has done, indeed he
deserve a second tenure in the office of the presidency. Vote
for the GOD chosen, President Goodluck Jonathan
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment